Construction Start:
20170711 -
Construction Finish:
20170901 -
Client:
San Jose Evergreen Community College District
About Project
2017 Project #31321 – Parking Lot & Street Repair at San Jose City College
Complete Asphalt Repair, Concrete, Sealcoat, Striping and install Bollards to create a new layout parking lot at Lot C.
Install ADA Concrete sidewalk and ramps, Trench, Grade, Compact, Run Conduit to Install Dual ChargePoint Electric Vehicle Charging Stations, Backfill, Paving, Sealcoat and Striping at Lots H & L.
Complete ADA Concrete sidewalk and ramps and Striping at Visitor Lot.
Subcontractors:
Voltaic (Video Voice Data Communications) – EVC Station & Electrical
Zuniga Striping – Striping, Pavement Markings & Signage
Dinsmore Landscape – Landscape & Irrigation